Concrete work for funicular lift, Turku
Demanding cast-in-place worksite on a hillside
1,000 m3 of concrete
Moulding, reinforcement and concreting works for the Kakolanmäki funicular lift. At the challenging site, the upper and lower station as well as the track foundations and earth pressure wall were built as cast-in-place. Part of the walls was done with fair-face casting. The site includes approximately 1,000 m3 of concrete.